Infrastructure

  STATUS OF INFRASTRUCTURE IN JNV'S


 

I Area of land allotted (in acres)    :58 acres 
Whether land transferred in the Name of Samiti  :Yes
Vidyalaya shifted to permanent buildings on  :1994 
II Status of Boundary Wall    : (Completed / Incomplete) 
a. Brick Wall    Brick Wall Completed 
b. Barbed wire fencing   
III Permanent buildings constructed    : (CBRI pattern/ CPWD pattern)
        CBRI Pattern 
IV School building    : Complete / Incomplete
  Complete 
V Dormitories    : Boys 06 Nos. 
  with Warden Residence 01 Nos.
: Girls 02 Nos. 
  with Warden Residence 01 Nos. 
VI Kitchen/dining Hall    : Complete
No. of shifts required for all students to take food     02 
VII Principal Residence    : 01 No. 
VIII Staff Quarters    : Type III = 12 Nos.
  Type II = 28 Nos.
  Type I = 01 Nos.
  SP Sheds converted into Staff 
  Qrs.:_____ Nos 
IX M.P. Hall    : Available 
X Workshop   : Available 
XI Type of O.H. Tank    : Column based
Its capacity  : 30,000 Gallon
Present Status  : Working satisfactory 
XII U.G. tank    : 30,000 Gallon
Its capacity Present Status  : Working satisfactory 
XIII D.G. Set    : Available 
: Kirloskar make 
: Working 
XIV Sewage Pump    : ___--_____ H.P. 
XV Water Pump    : 04 capacity
  02 Submersible
  02 Mono block 
XVI Electrification     
Electric connection : Rural
Sub Station building : Complete
Street lighting  : __________ Nos. of Poles
Numbers of hrs. during day when power supply is available on an average.  : 14 hrs. 
XVII Playfields     
400 metre track : Available/ not available
40 x 30 metre basket ball court : 01 Nos. – Available / not available
40 x 30 metre volley ball court  : 02 Nos. – Available / not available 
XVIII Water supply    
Tube Well : Potable, ______ Nos.- working / not working
Hand pump : Potable, 03 Nos.- working / not working
Connection from PHED  : NIL hours supply in a day 
XIX Rajiv Gandhi Smriti Van    : Available 
XX Fire fighting arrangement    : Working 
XXI Last date of cleaning of    
    (a)    Septic tank : May - 2008
    (b)    Water tanks  : May - 2008
XXII Whether area around transformer is fenced    : Yes 
XXIII Whether open wells, if any, are covered from top    : Yes 
XXIV Works taken up under M&R fund during current year and last year:-   
Year  Name of work   Expenditure Cumulative expenditure during the year 
(M&R)  (Rs. In lacs)